Post – Secondary

University of British Columbia (UBC)

  • UBC Vanier Commons

  • UBC Allard Hall – Office 147 Renovation

  • UBC Brock Commons Phase 2

  • UBC Brock Commons Phase 2 CA phase Vancouver, BC

  • UBC Brock Hall Annex Demolition

  • UBC Buchanan B-B142 Classroom Conversion

  • UBC CEME Room 1201 Renovation – Feasibility Schematic Design

  • UBC CEME Rooms 1203 and 1214 Renovations

  • UBC Center of Brain Health - Electrical Commissioning

  • UBC Centre for Comparative Medicine: Boiler Installation

  • UBC Chan Centre - Lighting Upgrade

  • UBC Chem Bio Building Rm 628 & 632 Renovation

  • UBC District Energy System (DES) Phases 6-9, Vancouver, BC

  • UBC District Energy System Phase 1

  • UBC District Energy System Phase 2 and 3

  • UBC Door Hardware Installations - UBC Vancouver BC

  • UBC Forest Science Centre Chiller Replacement

  • UBC Forest Sciences 2237/2239 & 2241/2413 - Room Renovation

  • UBC Forest Sciences Centre, Classrooms FSC 1611 & 1613 Renovations

  • UBC Forestry Sciences Center Room 2435 Renovations

  • UBC Indian Residential School History and Dialogue Centre

  • UBC Indigenous Law Clinic

  • UBC IRSDC Building AC Unit Upgrades

  • UBC Irving K. Barber Learning Centre - South Quadrant Feasibility Study

  • UBC JB MacDonald Renovation

  • UBC Koerner Library Entry

  • UBC Koerner Pavillion (UBC Hospital) Steam Conversion Study

  • UBC MacMillan Growth Chambers Room 218

  • UBC MacMillan Room 56 Change of Use

  • UBC MacMillan Theatre Renovation

  • UBC Math Building Handicap Lift Modernization

  • UBC Residential Neighbourhoods - EV Charging Strategy – Phase 1

  • UBC Robson Square Small Renovation

  • UBC Room 121 Klinck Building

  • UBC Student Union Building – Alma Mater Society

  • UBC Wesbrook AHU Upgrade

  • UBC Wesbrook Micro Steam Grid, Vancouver, BC

  • UBC Westbrook Village Welcome Centre Renovation

    British Columbia Institute of Technology (BCIT)

  • BCIT Administrative Upgrade

  • BCIT Burnaby Campus Lighting Strategy

  • BCIT Burnaby Campus Substation L Project Directive Preparation

  • BCIT CARI Building EV Installation

  • BCIT Electric Transportation Strategy Phase 1 Study

  • BCIT Electric Vehicle Charging Installation Barriers

  • BCIT EV Charging Engineering & Permitting Assistance

  • BCIT NE1 New Elevator Addition Feasibility Study

  • BCIT NE25 Room 102 Renovations Burnaby Campus

  • BCIT Pub Renovations

  • BCIT Riverbend Co-op (1050 Quayside Drive, New Westminster) EV Charging

  • BCIT SE04 HVAC Upgrade

  • BCIT SE10 Fire Alarm Replacement Project Directive

  • BCIT SE12 Data Centre HVAC Upgrade

  • BCIT SE12 Data Centre M&E Infrastructure Upgrades

  • BCIT Trades and Technology Building Design for Class C Costing

    Simon Fraser University (SFU)

  • SFU Sustainable Energy & Environmental Engineering (SE3P)

  • SFU Academic Quadrangle Envelope Upgrades (Burnaby)

  • SFU MCC Panel Upgrades

  • SFU Plaza Renewal

  • SFU Residence Development Phase 3

  • SFU Residence Development Program (Burnaby)

  • SFU Strand Hall Renovations L3000 Tenant Improvement

  • SFU Strand Hall Substation Replacement

  • SFU Surrey Campus Library and Information Technology Service Desk

  • SFU TransLink Exchange Fleet Electrification Requirements

  • SFU University Drive

Kwantlen Polytech University (KPU)

  • KPU Brew Lab Generator

  • KPU Cloverdale Dean Counseling Area

  • KPU Culture Centre Addition

  • KPU Interior Project AV Design

  • KPU Langley Classroom Renovation

  • KPU Surrey Birch Building Print Shop

  • KPU Surrey Campus and Langley Campus Elevator Modernization

Langara College

  • Langara College 601 W Broadway Computer Labs

  • Langara College Building B Renovations

  • Langara College District Energy

  • Langara College EV Chargers Feasibility Study

  • Langara College Improving Backup Generator Support

  • Langara College New Data Centre

  • Langara House Residence

Capilano University

  • Capilano 3 Interior Alterations Projects for Library & Maple Building

  • Capilano Centre for Childhood Studies Building

  • Capilano Learning Commons

  • Capilano Solar PV Pavilion Concept Design

  • Capilano University Student Housing

Okanagan College

  • Okanagan College Centre for Excellence

  • Okanagan College Trades Renewal and Expansion Project

  • Okanagan College Vernon Campus

  • RBC Okanagan College Kelowna

University of Fraser Valley (UFV)

  • UFV Abbotsford Campus Building D Chiller & Condenser Replacement

  • UFV Abbotsford Campus Library

  • UFV Lecture Theatre Classroom B101

  • UFV Science Lab

  • UFV Abbotsford Building B – Heat Recovery Chiller Replacement

University of Victoria (UVIC)

  • UVic ‘R’ Hut – New Fire Alarm System

  • UVic 106 Bed Dorms

  • UVic BEC 221 Additional Breakout Space

  • UVic BEC Building Room 467 Renovation

  • UVic BEC Dean's Office

  • UVic BEC First Floor Computing Facility Renovation

  • UVic Bob Wright Centre - East Wing

  • UVic Bob Wright Centre A201-A250 SCIE Renovation and Relocation

  • UVic Bob Wright Centre Animal Care Unit B015 Equipment Install

  • UVic Continuing Studies Building Expansion

  • UVic Continuous Optimization Program, Petch and University Centre

  • UVic COR, CUN, MAC Buildings - Electrical HV Service Upgrade

  • UVic Currie Hall Renovation

  • UVic David Strong Building Room C112

  • UVic Elliott KIP

  • UVic Elliott Physics Lab and Electrics Workshop Renovation

  • UVic ELW B120 Microfluidics and Nanotechnology (MiNa) Laboratory

  • UVic ELW B225 Prime Battery Test Equipment

  • UVic Engineering Precinct Expansion

  • UVic Fraser Building Moot Courtroom 150 Renovation

  • UVic Fraser Building Renewal

  • UVic Fraser Building, Replacement of Fire Alarm System

  • UVic Gordon Head RHB, RWI, RWA Fire Alarm Systems Changes

  • UVic Grad Student Centre (GSC) Alumni Bar Renovation

  • UVic Grad Student Centre (GSC) Alumni Bar Renovation

  • UVic Lansdowne Residence Accessibility Upgrade

  • UVic Lansdowne Residence Light Replacement

  • UVic Library Desk Reno

  • UVic MAC B125 Philip T. Young Recital Hall A/V Equipment Upgrade

  • UVic McPherson Library Graduate Student Space Renovation

  • UVic McPherson Library, Replace Westerly Wall Window System

  • UVic Mearns Centre 3rd Floor Renovation

  • UVic Mearns Centre for Learning MacPherson Library Third Floor Renovations

  • UVic Mearns Centre Penthouse Upgrade Existing Window Wall System

  • UVic Mearns Lower-Level Washroom Refurbishment

  • UVic Medical Sciences Bldg MSB 336 Electrical Upgrade

  • UVic Medical Sciences Building Rooms 150a 160a A/C Units

  • UVic Petch Lab 086-089b 270-289

  • UVic Petch Lab Relocation

  • UVic Petch NMR Lab

  • UVic Petersen Health Centre

  • UVic Residence Services Electrical/Fire Alarm Upgrade

  • UVic Residences Lounge Smoke Detectors

  • UVic RESS Cluster Buildings - Schematic Design Report

  • UVic Senate Chamber Refresher Feasibility Study

  • UVic Shaw Rooftop Wireless Connections

  • UVic Village Market Smoothie Bar

  • UVic Wallace Residence Services (RESS) Elevator #17, #51, #52, and #53 Upgrade

  • UVic Welcome Centre Renovations to University Centre

    Royal Roads University

  • Royal Roads University Library Phase 2

  • Royal Roads University Library Renovation

  • RRU Aboriginal Gathering Place

  • RRU Arbutus 7a Network Upgrades

  • RRU Grant 321-325 Media Lab Conversion

  • RRU Grant Building Assessments

  • RRU Grant Building Boiler Replacement

  • RRU Grant Labs 104 106 Upgrade

  • RRU Nixon Building

  • RRU Nixon Building Elevator Upgrade

  • RRU Nixon Sectionalizer

  • RRU Pool Building Auditorium

  • RRU Rose Garden Cottage

  • RRU Sustainability Initiatives Feasibility Study and Options Analysis

  • RRU Sustainability Initiatives LIC Plaza EV Infrastructure

  • RRU Sustainability Initiatives Overhead Infrastructure Upgrade

  • RRU Unit Substation Replacement

  • RRU West Shore Initiative

  • RRU WSC

    Camosun College

  • Camosun Campus Centre Building Office Renovation

  • Camosun Clearihue Building Room 067/068

  • Camosun College Accessible Lift for CTEI Building

  • Camosun Feasibility Studies Relocation of Environment Laboratories

  • Camosun Film Studio

  • Camosun Fire Alarm Panel Replacements

  • Camosun Interurban Campus March 18 Power Outage

  • Camosun Jack White and Drysdale Building Upgrades

  • Camosun Jack White Building Office Renovation

  • Camosun LED Light Installation

  • Camosun Lansdowne Campus Dental Building

  • Camosun Lansdowne Campus Lighting Audit

  • Camosun Lansdowne Campus Smart Electrical Metering Upgrade

  • Camosun Lansdowne Exterior Lighting Study

  • Camosun TEC Building Generator Upgrade Interurban Campus

  • Camosun Trades Renewal Project Interurban Campus

  • Camosun Wilna Thomas Renovation

  • Camosun Young Building Upper Floor Renovations

  • Vancouver Island University (VIU)

  • VIU B185 Transformer OC Protection

  • VIU Building 120 Generator

  • VIU Building 130 Distribution Upgrades

  • VIU Building 150 Distribution Upgrade

  • VIU Building 305 Upgrade to Emergency Power

  • VIU Fire Alarm Replacement

  • VIU Gathering Place

  • VIU Health and Human Services Office Portable Building

  • VIU Health and Science Centre Feasibility Study

  • VIU Infrastructure 5 Year Plan

  • VIU Trades Facility Powell River

  • VIU Transit Exchange

  • Alberta

  • King's University Academic Enrichment Centre

  • MacEwan University New Academic Building - School of Business

  • Olds College AG Tech Hub

  • Olds College Animal Health Education Centre

  • Olds College Base Building Upgrades

  • Olds College Farm Shop

  • University of Calgary - Dining Centre FAVI

  • University of Calgary AD059 Partial Verification

  • University of Calgary Alumni Office Renovation

  • University of Calgary ENA - FAVI

  • University of Calgary HSC 723A Partial Verification

  • University of Calgary SA 211, 211A, 211B, 211C, 216 Renovations

Previous
Previous

Office Buildings

Next
Next

Recreation